What types of construction works do you perform?+
Full-cycle construction across 11 state licence categories — industrial, civil and public facilities, hydraulic structures, roads and bridges, steel and reinforced-concrete structures, façade works, engineering utilities and special industrial structures. Each category has its own licence and its own documentation register.
How long has the company been in business?+
Azəri Təmir Tikinti LLC was founded in Baku in 2006 and has since delivered 150+ state and corporate projects. The first years focused on small repairs, since 2017 we work on state contracts, and since 2019 we are specialised across 11 licence categories. That is the company’s growth path.
In which regions do you work?+
We operate across the whole territory of Azerbaijan: Baku and Absheron peninsula, Ganja-Gazakh, Shaki-Zagatala, Lankaran-Astara, Aran and Shirvan-Salyan economic regions. Each project runs with a local site office and a permanent engineering supervision team.
Who are most of your clients?+
Most of our clients are state structures and corporate enterprises — ministries, state services, municipalities, industrial parks and large private companies. We accept private projects too when the requirements and minimum budget fit our scope.
How long from inquiry to project start?+
Consultation and site visit — 1-3 business days, initial technical proposal — 5-7 days, design phase — 2-8 weeks depending on scope. Stages can run in parallel to reduce total time.
Do you engage subcontractors?+
Yes — for specialist MEP, geological and skilled trades we use a vetted subcontractor network. Every subcontractor must meet our HSE and quality standards and cannot enter the site without induction training. The subcontractor chain is transparent in the client contract.
Can changes be requested during construction?+
Yes — there is a formal variation-order process. The client submits a written request, we evaluate the technical and budget impact, the agreement is signed and implemented. All changes are reflected in the schedule, the cost estimate and the final handover documents.
How does the warranty work after project completion?+
A standard 2-year warranty applies to every delivered facility; an extended 5-year warranty is possible for core structural elements. Within the warranty period the client submits a written request and the matter is assessed and handled within 48 hours.
How are your HSE protocols organized?+
Built on an ISO 45001:2018 certified system: JSA at the start of every shift, 1,000+ training hours per year, a permanent on-site HSE inspector, Permit-to-Work for high-risk activities, site-specific ERP. Every incident is documented, a root-cause analysis is performed and preventive actions are implemented.
To what extent must subcontractors follow HSE rules?+
Subcontractors fully follow our HSE standards. Every subcontractor worker must complete the site induction, carry the required PPE and join the daily briefings. The HSE manager also supervises subcontractor staff; rule violations lead to immediate site removal.
How do you minimise environmental impact?+
At least 85% of construction waste goes to recycling, dust-suppression spray systems are deployed on site, water usage is metered and optimised. Local material sourcing cuts logistics-related emissions by roughly 30%. Every project has its own environmental control document.
What happens in case of an on-site incident?+
The incident is reported to the HSE manager immediately, the site is temporarily stopped, first aid is administered and emergency services are called if required (112). Within 1 hour — assessment, within 24 hours — root-cause analysis and corrective actions are documented. The client receives a formal report.
How is pricing determined?+
A detailed cost estimate is prepared based on the site visit, geological conditions and project scope. Each work category is shown with transparent unit-quantity breakdown. Materials, labour, equipment and overhead are listed as separate lines. The contract is not signed until the client approves the estimate.
How is the payment schedule structured?+
Payments are tied to staged acceptance: deposit, foundation completion, frame completion, façade/finishing stage and final handover. At each stage the client accepts the work and signs the corresponding document. No payment is requested outside the delivery schedule.
How accurate is the preliminary estimate?+
With full design documentation the estimate accuracy is ±5%; at the preliminary site-visit stage it may deviate by up to ±15%. A contingency reserve for geological and unknown conditions is shown as a separate line and agreed with the client.
Which payment methods do you accept?+
For corporate and state clients — bank transfer in AZN and foreign currencies (USD, EUR). Each payment is issued an official VAT invoice; our VAT ID and tax documents are provided. Bank fees are borne by the client.