Railway construction
Subgrade, ballast, rail-and-sleeper grid, turnouts, welding and tamping — full-cycle construction of main-line and industrial railways.
From subgrade to commissioning — full-cycle railway construction.
A railway line is far more than rails and sleepers. Beneath it sits a layered, calculated subgrade; alongside it, a drainage system; above it, a geometry measured in millimetres. If any one of those layers drifts outside the design parameters, the consequence does not show up in the track itself — it shows up in speed restrictions, in wheel–rail wear and in the annual maintenance budget.
Azəri Təmir Tikinti delivers railway infrastructure as a single chain: from setting out the alignment and cut-and-fill earthworks to the ballast layer, from assembling the rail-and-sleeper grid to installing turnouts, through welding, tamping and geometric acceptance. Instead of several contractors colliding on one site — one schedule, one quality system, one point of accountability.
Substructure: everything starts here
The subgrade is the hidden part of a railway, and it is what determines the life of the line. The bearing capacity of the soil is confirmed by laboratory testing, fill is placed in layers and every layer is compacted separately. Compaction factors are checked on site and the results go into the as-built documentation. Slope stability, side ditches, culverts and drainage outlets are resolved at the same stage — because water is a railway's first enemy.
Superstructure: geometry has to be measurable
The ballast bed, the sleeper grid and the rails form the superstructure. Here the job is not to "look right" but to stay inside a measurable tolerance: gauge, cross level, longitudinal profile, curvature and cant. After adjustment with tamping and lining machines, the geometry is confirmed by control measurements and attached to the acceptance protocol.
Welding and continuously welded rail
The joint is the weakest point of a line: every joint is a source of dynamic impact loading. Continuously welded rail, formed by welding rails together, sharply reduces the number of those points — improving the speed regime, lowering the load on ballast and sleepers, and cutting the annual maintenance volume. The welding regime is held under automated control and the weld zone is ground back to match the geometry of the rail profile.
Licence, standards and documentation
Works are carried out under a state licence, to SNiP and AZS norms and, where the project requires it, to EN standards. The company's quality management system is built to ISO 9001:2015 and its occupational health and safety system to ISO 45001. As-built documentation, test protocols and hidden-works certificates for every stage are handed over to the client as part of the completion package.
What we do.
01Setting out and subgrade
We begin by re-establishing the survey control and setting the alignment out on the ground: centre line, chainage, cross sections. Cut-and-fill volumes are calculated from a digital terrain model and the bearing capacity of the soil is confirmed by laboratory testing.
Fill is placed in 20–30 cm layers, each layer compacted separately, with the compaction factor measured on site. Slope gradients, berms and soil-replacement zones are executed to the design cross section.
02Drainage, ditches and culverts
Water is a railway's first enemy: water soaking into the subgrade destroys compaction, and in winter the freeze–thaw cycle lifts and drops the track. The drainage system is therefore built at the same time as the formation, never left until later.
Side ditches, chutes and channels, drain pipes, culvert pipes and headwalls are positioned according to the design flow calculation, while cross falls keep water moving away from the formation.
03Ballast bed and sub-ballast
Ballast is the layer that distributes the load from the sleeper into the subgrade while allowing the track to be adjusted. Crushed granite with fractured faces is used, with shape index, abrasion resistance and fines content verified by laboratory testing.
A sub-ballast layer is spread and profiled first, then the main ballast is placed. Shoulder width, depth and profile are held to the design cross section, and during tamping the ballast is consolidated under the sleepers.
04Assembling the rail-and-sleeper grid
This is where the body of the superstructure takes shape: sleepers laid out to spacing, rails placed and fastening assemblies installed. The choice between concrete and timber sleepers follows the design loading, the speed regime and the operating conditions.
Fastening components — bolt sets, base plates, elastic clips and insulation parts — are installed as complete assemblies with torque under control. Gauge is checked with a template during installation and then confirmed by measurement.
05Turnouts and junctions
A turnout is the most complex and most heavily loaded element of a line: here the rail profile is interrupted and the wheel transfers from one track to another. The assembly matching the crossing angle (1/9, 1/11 and so on) is put together on site, bearers are laid and the turnout is set precisely on the design axis.
After installation, measurements are taken on the axis, gauge, check-rail clearance and switch blades; where a point machine and heating system are specified, they are connected and tested at the same stage.
06Rail welding and continuously welded track
Every joint is a source of dynamic impact loading. Continuously welded rail, formed by welding rails together, reduces those points to a minimum: the speed regime improves, impact on ballast and sleepers drops, and the annual maintenance volume falls.
Rail ends are prepared, the welding regime is held under automated control and the weld zone is ground back to match the geometry of the rail profile. The stress-free temperature of the string is selected to the design and documented.
07Structures: bridges, viaducts and tunnels
Where the alignment crosses a river, a ravine, a road or an existing line, a structure is required. Substructures and spans, reinforced-concrete and steel elements, waterproofing and expansion joints are all executed within a single design solution.
This work connects directly to the company's bridge construction, steel structures and concrete and reinforced concrete capabilities — so no separate contractor has to be brought in.
08Tamping, geometry and commissioning
An assembled track is not yet a finished track. Tamping, lining and levelling machines bring the track to the design profile: longitudinal profile, cross level, curvature and cant are adjusted and the ballast is consolidated under the sleepers.
Control measurements are then taken against the geometric parameters and the results are attached to the acceptance protocol. The handover package includes as-built documentation, hidden-works certificates, material certificates and test protocols.
4-stage industry standard.
Consultation
Site visit, geological conditions, budget framing.
Design
Technical documents, calculations, state expertise.
Construction
Execution, monitoring, phased acceptance. 24/7 site oversight.
Handover
Documented handover, warranty, ongoing technical support.
Which standards we follow.
ISO 9001:2015
Quality Management Systems. International standard applied across all our processes.
ISO 14001
Environmental Management System. Water and soil protection standards.
ISO 45001
Occupational Health and Safety. On-site work safety protocols.
AZS / SNiP
Azerbaijan state construction codes. Full compliance with local standards.
Railway construction project?
Contact us for initial consultation, project scope and preliminary estimate.